Maps
 
  Unbuilt Highways
DC’s proposed but never built highways.
 
  Census Tract Density
Population density maps for census tracts within the 20 largest US urbanized areas.
 
  Other maps
View the full maps library.


Image Library
 
  Transportation
Transit, bikes, roads, and more. Sorted by mode and location.
 
  Urbanism
Cities and neighborhoods. Sorted by location.
 
  Flickr Flickr
View BeyondDC's full flickr photostream.


Other Features
 
  Frequent Transit Maps
Links to all known US and Canadian frequent transit maps, official and unofficial.
 
  Streetcars vs Buses
The differences between them, and why streetcars are often better.
 
  Archived features
Other features.

Blog
Dulles Metro must go to Dulles Airport

click to enlarge
Photo by XYZ+T on Flickr.

It seems like a no-brainer that the long-planned Dulles Airport Metro line should include a stop at Dulles Airport, but to one key decision-maker, that remains an open question.

At yesterday’s meeting of the Metropolitan Washington Airports Authority (MWAA), board member Robert Clarke Brown, a presidential appointee, suggested re-routing Phase 2 of the Silver Line to skip Dulles Airport.

The airport station is expensive, he says, and so MWAA should consider simply not building it. Metro riders hoping to access Dulles would instead transfer to some kind of shuttle or people-mover from the Route 28 station, the next closest.

Skipping the airport and replacing it with a people-mover would reduce the project’s overall $2.8 billion price tag by approximately $70 million. That, argues Brown, is reason to take his suggestion seriously. It shouldn’t be.

To the MWAA board’s credit, they quickly rejected Brown’s proposal. As they should have. The main goal of Phase 2 of the Dulles Metro project is to provide service to Dulles Airport. Failing to do so means the project would not meet its main goal.

Cutting so many corners that you don’t achieve your goal is not cost savings, it’s failure. Far from saving $70 million, by failing to provide Metro service to Dulles Airport Brown’s proposal would actually waste billions.

After all, if you’re going to force airport riders to transfer onto a shuttle anyway, why not make the transfer at Whiele Avenue, the end station for Phase 1? Why bother building Phase 2 at all? The other Phase 2 stations are all primarily park and rides, and it doesn’t make much difference at which station drivers park, so without the connection to Dulles Airport the entire argument for why Phase 2 is necessary in the first place becomes extremely flimsy.

So flimsy that many people would wonder whether the project were worth its $2.8 billion (minus $70 million) price.

The planning history of the Silver Line is replete with compromises. Express tracks to the airport or no express tracks? A subway through Tysons Corner or an elevated line? Airport station at the terminal or a few hundred feet away? At every step of the process, planners have had to weigh the ideal service situation agaist the costs. That’s life in the world of transportation planning.

But this is one compromise that absolutely cannot under any circumstances be made. The absolute minimum requirement for a Metro line to Dulles Airport must be that it actually reaches Dulles Airport. Period.

Cross-posted at Greater Greater Washington.
 
 
 

January 19th, 2012 | Permalink | {num}Comments
Tags: airports, metrorail, transportation



Twitter


Site
About BeyondDC
Archive 2003-06
Contact

BeyondDC via XML RSS

Search:

GoogleBeyondDC
Category Tags:

Partners
 
  Greater Greater Washington
 
  Washington Post All Opinions Are Local Blog
 
  Denver Urbanism


Blogs about urban issues in and around Washington, DC

Urbanist blogs nation-wide

PLANetizen Top 50 Website 2003



BeyondDC v. 2013a | All rights reserved | 2003-2006 archive | Contact |