Special Features

Image Libraries

Blog

click to enlarge
Amtrak Acela.
Photo by jpmeuller99.

The Federal government announced today $2 billion in new grants for high-speed passenger rail projects around the country. $800 million will go to rail improvements along the Northeast Corridor, and $300 million for high-speed rail in California.

The funds are left over from $2.4 billion which had been originally allocated to Florida, but which governor Rick Scott returned to the Federal government. Congress rescinded $400 million as part of the recent budget deal, leaving $2 billion to allocate to new recipients.

Despite ideological opposition from a number of Republican governors, there was no shortage of states interested in using the money. USDOT received 98 applications for the funds from 24 states plus the District of Columbia, totaling approximately $10 billion. Clearly there continues to be more demand for passenger rail funding than Congress can keep up with.

As expected, the big winners are the Northeast Corridor and the California high-speed rail project, each of which were given hundreds of millions of dollars. In a little bit of surprise, the Midwest Chicago-hub was also a big winner, with major improvements funded on several corridors.

The Washington region didn’t receive any funds directly, although we will benefit from some of the projects to the north and south. The District applied for but did not receive money. Maryland applied for $415 million and received $22 million that will go to planning for a new Susquehanna River bridge. Ironically, Virginia didn’t apply for any money but received some anyway, as part of a North Carolina-led application to perform environmental planning work on proposed upgrades to the Richmond-Raleigh corridor.

The Northeast Corridor will benefit from the $450 million devoted to catenary and signal improvements in central New Jersey. This funding will pay for installation of constant-tension catenary over a 24-mile section of track, raising the top speed from 135 to 160 miles per hour. Other Corridor improvements will result in minor trip time improvements and reduction in bottlenecks.

The complete breakdown of grant recipients is shown in the table below. The acronym “NEPA”, which appears a number of times, refers to the National Environmental Policy Act requirement for environmental planning approval of federally-funded projects.


Location Amount Purpose
NORTHEAST CORRIDOR
New Jersey $450m Power, signal, track, catenary improvements supporting 160mph service
New York $295m Bypass tracks for high-speed trains in NYC area
Rhode Island $25m Bypass tracks for high-speed trains in Kingston area
Maryland $22m Planning & NEPA to replace Susquehanna River bridge
Rhode Island $3m Planning & NEPA for renovations for Providence station
NORTHEAST (NON-NEC)
New York $58m Track, station, signal upgrades to Empire corridor, including replacement of Schenectady station and 4th track at Albany-Rennsselaer station bottleneck
Pennsylvania $40m Track & signal upgrades to Harrisburg-Philadelphia line
Connecticut $30m Double track New Haven-Springfield line
Massachusetts-Maine $21m Double track Wilmington-Andover line
New York $1m Planning & NEPA for new Rochester station
MIDWEST
Non-specific $268m 48 railcars and 7 locomotives for 8 Amtrak corridors in the Midwest
Michigan $197m Track & signal upgrades on Chicagao-Detroit line between Kalamazoo and Dearborn, allowing 110 mph service for 235 miles of corridor
Illinois $186m Track upgrades on Chicago-Saint Louis line between Joliet and Dwight, IL allowing 110 mph service for 220 miles of corridor
Missouri $14m Design for new Mississippi River bridge on Chicago-Saint Louis corridor
Minnesota $5m Planning & NEPA for new 110mph service from Minneapolis to Duluth
Michigan $3m Planning & NEPA for new Ann Arbor station
SOUTH
Texas $15m Planning & NEPA for new Dallas-Houston corridor
North Carolina-Virginia $4m NEPA for 110mph upgrades to Richmond-Raleigh corridor
WEST COAST
California $300m 20 miles of track construction near Fresno for the 220mph California high speed rail project
California $68m 15 railcars and 4 locomotives for existing California Amtrak routes
Washington $15m Track grade separation at the Port of Vancouver, near Portland, OR
Oregon $2m Study of service and capacity needs near Eugene

 Cross-posted at Greater Greater Washington.
 
 
 

Average Rating: 4.4 out of 5 based on 247 user reviews.

May 9th, 2011 | Permalink
Tags: government, intercity, transportation



Media

   
   



Site
About BeyondDC
Archive 2003-06
Contact

Search:

GoogleBeyondDC
Category Tags:

Partners
 
  Greater Greater Washington
 
  Washington Post All Opinions Are Local Blog
 
  Denver Urbanism
 
  Streetsblog Network



BeyondDC v. 2013d | Email | Archive of posts from 2003-2006