Special Features

Image Libraries

Blog

For the first time, an actual Metro railcar has started to appear on the Silver Line. Construction crews are pulling it along the tracks, checking to make sure there are no obstructions. Test trains will be a common sight through the rest of the construction period, until opening day late in 2013.

Overall construction of Phase 1 is 87% complete, and the tracks themselves are essentially done. The last 13% is mostly to stations and electrical equipment.


Photo by Leslie Pereira of Dulles Transit Partners.

Average Rating: 4.5 out of 5 based on 235 user reviews.

January 15th, 2013 | Permalink
Tags: metrorail, transportation



Media

   
   



Site
About BeyondDC
Archive 2003-06
Contact

Search:

GoogleBeyondDC
Category Tags:

Partners
 
  Greater Greater Washington
 
  Washington Post All Opinions Are Local Blog
 
  Denver Urbanism
 
  Streetsblog Network



BeyondDC v. 2013d | Email | Archive of posts from 2003-2006