Special Features

Image Libraries

Blog

The first Capital Bikeshare station was installed today at 18th and Bell Streets in Arlington, adjacent to Crystal City Metro.

With 19 bike docks, the station will be the largest in Arlington as well as the first. The components all came pre-fabricated and just had to be unloaded and pieced together. It took workers a little over an hour to perform the job, which they did with the help of a small crane.

In addition to bike docks, the station includes panels for paying and maps, and solar power collector. Bikes will come in a couple of weeks when the system is closer to launch.

See below 41 photos showing the installation process from start to finish.

Average Rating: 4.4 out of 5 based on 269 user reviews.

August 31st, 2010 | Permalink
Tags: bike, galleries, transportation



Media

   
   



Site
About BeyondDC
Archive 2003-06
Contact

Search:

GoogleBeyondDC
Category Tags:

Partners
 
  Greater Greater Washington
 
  Washington Post All Opinions Are Local Blog
 
  Denver Urbanism
 
  Streetsblog Network



BeyondDC v. 2013d | Email | Archive of posts from 2003-2006